Annual Street Construction Program
2020 Street Construction
During the construction season this year, 12 city streets will be reconstructed or restored. The work is funded by the Local Option Sales Tax. Reconstruction involves a total removal and replacement of the roadway, and underground utilities are replaced if needed. Often it requires closing sections of the road for two to three months. Restoration is typically an asphalt overlay, but could include fixing the curb or other smaller issues. Road closures for restoration are typically shorter or only partial closures.
The street with the most impact to traffic will be W. 12th Street from College St. to Tremont St. This project also includes Walnut St. from 11th St. to 12th St. This project will be split into two stages. Stage 1 begins on W. 12th St. from College St. to Tremont St. with a full closure during this time. Upon completion, Stage 2 will be completed requiring full closure of Walnut St. from 11th St. to 12th St. It is anticipated that Phase I will take up to fourteen (14) weeks and Phase II will take up to ten (10) weeks. All work should be completed by September 11, 2020. See image below.
Sign up for Project Update Notifications
Click here to sign up under Notify Me to receive project updates via email. Sign in with your email address, then select "Annual Street Construction and Road Construction Updates" from the list of options.
Other streets with construction in 2020 are listed below.
Click on the street name link (if applicable) to see the most recent update.
Street | From | To | Status |
---|
West 12th Street | College Street | Tremont Street | Click Here for Latest Update |
West 26th Street | Iowa Street | Tremont Street | Construction Not Started |
Carlton Drive | Lilac Lane | Maplewood Drive | Complete |
Chateau Court | West 4th Street | End | Complete |
Holmes Drive | West 4th Street | School Entrance | Complete |
Seerley Blvd. | Valley Park Drive | Melrose Drive | Complete |
Ashland Avenue | Acorn Lane | Pin Oak Drive | Complete |
Union Road | West 1st Street | North City Limit | Click Here for Latest Update |
Lilac Lane | McClain Drive | Rownd Street | Click Here for Latest Update |
Madison Street | Valley Park Drive | Waterloo Road | Click Here for Latest Update |
West 11th Street | Division Street | College Street | Click Here for Latest Update |
Clearview Drive | Primrose Drive | Orchard Drive | Complete |
Some work remains from the 2019 Street Construction project. Streets should not have closures"
Click on the street name link (if applicable) to see the most recent update.Street |
From | To |
---|
Cedar Heights Dr. | Rainbow Dr. | Pleasant Dr. |
Clark Dr. | Summit Dr. | Laurel Circle |
Lilac Lane | McClain Dr. | Carlton Dr. |
Melrose Dr. | University Ave. Frontage | Royal Dr. |
Franklin St. | West 18th St. | West 20th St. |
Oregon Road | Dallas Dr. | South Main St. |
Edwards Ave. | Rainbow Dr. | Grand Blvd. |
Big Woods Rd. | Dunkerton Rd. | North City Limits |
Garden Ave. | Rainbow Dr. | Pleasant Dr. |
Highland Dr. | West 3rd St. | West 4th St. |
Holmes Dr. | West 4th St. | Holmes Elementary |
Lexington Dr. | West 12th St. | Concord Dr. |
Terrace Dr. | Rownd St. | Dead End |
Hudson Rd. | West 22nd St. | West 12th St. |
Rainbow Drive | ||
N. Division Street | ||
W. 16th Street |